How we work

From analysis to rig floor.

One process across every engagement, whether it’s a single program review or a full campaign. You always know what we’re doing, what it costs, and what you’ll get at the end.

The process

Five steps, one team.

Engineering-only engagements stop after step two. Turnkey work runs all five. Either way, the same people carry it through.

  1. 01

    Assess

    We review the well plan, the program, and the constraints — and agree on the problem you actually need solved. Scope, deliverables, and fees are set in writing before work starts.

  2. 02

    Engineer

    Drilling program, hydraulics, and pressure/well-control design, modeled and stress-tested before anyone mobilizes. Your engineers review it with ours, not after us.

  3. 03

    Specify

    The right equipment for the application — sized, spec’d, and matched to the engineering, not to a catalog.

  4. 04

    Supply

    We source and deliver the hardware through our vetted network — quality-assured and on schedule.

  5. 05

    Support

    On-site commissioning, testing, and field engineering — until it runs the way it was designed to. Then a post-well review against the plan, so the next well starts ahead.

The well lifecycle

One partner,
every phase.

Before anyone mobilizes

The well is drilled on paper first. Casing and cementing design, hydraulics, torque & drag — modeled, stress-tested, and priced before a single truck rolls.

  • Well & casing design
  • Hydraulics + torque & drag modeling
  • Permitting & regulatory support

What we hold ourselves to

Engineering first. Hardware to match.

01

Independent judgment

Recommendations answer to your well and your economics — not to a single manufacturer’s product line.

02

One accountable partner

The team that engineers the program also specs and supplies the hardware. No gaps between the plan and the parts.

03

Cost per foot, not cost per part

Right-spec’d equipment and fewer failures matter more than the cheapest line item.

04

Written down

Programs, procedures, and reviews your team can file, audit, and reuse.

The cost of waiting

What does NPT
cost you a year?

Every hour a rig waits, the spread rate keeps running. Put your numbers in — then ask whether the engineering was the expensive part.

Annual cost of NPT $4,080,000
Engineer it out

Start a conversation

Tell us about the well.

An engineer reads every request and replies within one business day.