Equipment supply

The full equipment line, specified by engineers.

Summit sources and delivers drilling and well-service equipment through a vetted global supply network — matched to the engineering, quality-assured, and supported in the field.

Equipment lines

Eight lines, one supplier.

Described in standard industry terms. If it isn’t listed and it turns to the right, ask — we can usually source it.

Mud Pump Systems & Expendables

  • Fluid-end modules
  • Pistons & liners
  • Valves & seats
  • Pulsation dampeners
  • Pump rebuild kits
Quote this line →

Pressure Control Equipment

  • Gate valves
  • Relief valves
  • Choke systems
  • Actuators
  • Test & recertification
Quote this line →

MPD & Rotating Control

  • Rotating control devices
  • MPD chokes
  • Control systems
  • Bearing assemblies & elements
Quote this line →

Top Drive Systems

  • Top drives
  • Swivels
  • IBOP valves
  • Upgrades & retrofits
  • Spare parts
Quote this line →

Pipe Handling & Makeup

  • Iron roughnecks
  • Slips & safety clamps
  • Dies & inserts
  • Elevators
Quote this line →

Well Service & Workover

  • Power swivels
  • Conversion & upgrade kits
  • Well-service fluid ends
Quote this line →

Rig Accessories & Consumables

  • Centrifugal pumps
  • Bushings
  • Strippers & wipers
  • Test cups
Quote this line →

How supply works

Engineering first. Hardware to match.

Most suppliers sell a product. We start from the well and work back to the part — so what arrives on location fits the program it was bought for.

  1. 01

    Specify

    The application comes first. Equipment is sized and spec’d against the engineering — pressure ratings, service conditions, and the rig it has to fit.

  2. 02

    Source

    We source through a vetted supply network, matching the spec rather than steering you to one manufacturer’s catalog.

  3. 03

    Quality-assure

    Documentation, inspection, and test records checked against the spec before anything ships.

  4. 04

    Deliver

    Scheduled to the operation, with the paperwork your receiving and asset teams need.

  5. 05

    Support

    Commissioning, testing, recertification, and field engineering until it runs the way it was designed to.

Request for quote

Send us the spec.

Part numbers, sizes, pressure ratings, quantities, and where it needs to land. A rough list is fine — we’ll come back with questions before we come back with a price.

  • Equipment line and part numbers, if you have them
  • Quantities and required-on-location date
  • Rig or unit it’s going on
  • Any documentation or certification requirements

Start a conversation

Tell us about the well.

An engineer reads every request and replies within one business day.